UPDATE, JULY 31, 2020----"We are scheduled to start the driveway apron this week, July 26-31, with the State Maintenance Crew, not the contractor." ***The road repaving ended June 26., with DOT crew. Then the contractors were to finish the roadside work. They drilled out our driveway, leaving a several-inch "ledge." That make sit bumpy pulling into our driveway. But here is the worst part: When I back out of the driveway, I always try to use as much of the "apron" as possible, not wanting to back directly into the roadway. NOW, the wheels on the passenger side of my car (as I head toward the village) drop into the aforementioned ledge. The exit is not smooth.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment