Jan.7-------Spa Tub installed---Dale also Feb.7
Feb. 3------The Wall repaired by J.T.
Apr.13-----Drain Care pumped septic tank
Apr.14-----Bender Labs Water Test
April 18----Kitchen Faucets, Ryan Klass
Apr.28-----Shane Napoli Brush Removal **Picture #4
Apr. 30----Old Paint to Sch. Garage, about 40 containers
May 21---Outside Ramp installed by Carl, VA June
June 18---Concrete poured for J.T. slab
July 14--Attorney
Aug. 9----Stump grinding, McCray **Picture #3
Sept.7----H&R Block
Oct. 5----Furnace installed, Holbrook@ Home Depot---Picture #5
Oct.14--Basement door repaired---Jason------- *Picture #1
Oct.17---Foundation caulked, Jason------------- Picture #2
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment